January 2019: Excavation and Foundation

The construction work of the Cathedral of Our Lady of Arabia is well underway. In the photos you can see the excavation & the laying of the foundation of the Cathedral itself. This is called the the slab or base stage. As the name suggests, this is simply when the foundation is laid. It includes measuring out the design on the site, pouring the footings, under slab drainage, moisture barrier and special mesh for termite protection.

This entry was posted in All. Bookmark the permalink.

Comments are closed.