September 2019 – Laying and Levelling the Floor

The construction work of the Cathedral of Our Lady of Arabia is continuing. In the photographs below, we see the workmen laying and levelling a floor screed. The word “screed” actually means “an accurately levelled strip” of material laid on a wall or floor as a guide for the even application of a covering.

 

This entry was posted in All, Cathedral. Bookmark the permalink.

Comments are closed.